Project: Realisation of the steelconstruction for the acces of the Furnace F6007 and maintenance structure Refinery Site EKC Rotterdam
Client: Stork Netherlands
End-Client: Emerald Kalama Chemical Rotterdam
Scope of Work:
The fabrication, hot-dip galvanizing and assembly of Structural steel for structures and supporting equipment, piperack, staircase and handrails. Also delivery and erection of 280 m2 grating for each floor.
– Status: Completion March 2022
– Tonnage: 90 tons of steel construction acc. to EN 1090-2 EXC. 3