Steelconstruction Furnace Emerald Kalama Chemical

Rotterdam NL

Project: Realisation of the steelconstruction for the acces of the Furnace F6007  and maintenance structure Refinery Site EKC Rotterdam

Client: Stork Netherlands

End-Client: Emerald Kalama Chemical Rotterdam

Scope of Work:

The fabrication, hot-dip galvanizing and assembly of Structural steel for structures and supporting equipment, piperack,  staircase and handrails. Also delivery and erection of 280 m2 grating for each floor.

– Status: Completion March 2022

– Tonnage: 90 tons of  steel construction acc. to EN 1090-2 EXC. 3

Other projects

All Weather Terminal Arcelor Mittal Flat Products
Gent, Belgium
Pedestrian Bridge and 2 stairtowers Halle Belgium
A8 Halle België
Hitachi Zosen Inova Powerplant
Zwitserland
Renovation of building USAG
Brunssum, The Netherlands
New construction hotels Maankwartier
Heerlen, The Netherlands
New Proces Building for Canpack (fase 2)
Helmond, The Netherlands
Finishing Project PPF6
Sabic Geleen, The Netherlands
Lokschuppen Ineos Phenol
Gladbeck, Germany